| Owner | Montgomery County |
| Bridge Name | Westbrook Road Bridge over Dry Run Creek |
| Manufacturer | Hardcore Composites |
| Manufacturing Method | VARTM |
| Deck Dimensions | 34’-3” x 32’-8” |
| Total Square Footage | 975 |
| Scheduled Installation Date | May 2000 |
| Required Loading | HS20 |
| Skew | 21 deg. |
| Spans | Single Span |
| Wear Surface | Asphalt |
| Guard Rail | Attached to deck |
| Comments | Self-supporting all FRP deck. Widening bridge from existing ~30’. |
County Contact:
Joe Litvin, County Engineer
451 W. Third Street
Dayton, OH 45422-1260
Phone: 937-225-4904
Fax: 937-496-7441
E-Mail: mot_eng@dayton.com
Installation:









