In May 2002, NCC inspected all FRP county decks installed in 2000-2001
- Visual inspection
- Live load test: dual axle trucks with a gross weight of 20 tons were driven across the bridges at approximately 35 MPH
- FRP decks in excellent condition and operating properly
- Minor “repairs” on four bridges were performed by NCC with counties assistance.
For full inspection report contact:
Ela Kos at (937) 297-9522 or ekryjkos@compositecenter.org
Return to Decks Installed in 2000-2001
Return to Infrastructure
